IBB Waste Incineration and Energy Generation Facility

With the IBB Waste Incineration and Energy Production Facility built by Makyol İnş. San.Turz. ve Tic. A.Ş + Hıtachı Zosen Inova Ag (Business Partnership) companies located in the Eyüpsultan district of Istanbul, 3000 tons of waste will be incinerated daily.

Further;

  • 78 MWH of Electrical Energy and 175 MWH of Heat Energy to be Produced
  • 15% of Istanbul’s Daily Domestic Waste Amount Will Be Disposed
  • 1.38 Million Tons of Greenhouse Gases Will Be Reduced
  • The Electricity Needs of 1.4 Million People Can Be Met with the Generated Energy

Services Provided

Natural Ventilation Consultancy

Transformer Room CFD Analysis

Teklif Alın

Get a quote

Alkazar Technology
Privacy overview

No cookie other than the strictly necessary ones is placed on your device before you opt in. You can switch each category on or off separately and change your choice or withdraw your consent at any time through the "Cookie settings" icon in the corner of the page. Controller: Alkazar Mühendislik ve Danışmanlık Ltd. Şti.